• Delivering significant cost, efficiency and environmental benefits.
Carbon Reduction
  • Enabling the initiation of the Zero Emission Vehicle (ZEV) airside project.
Airport Sustainability Study
  • Sustainability study modelling GSE replacement with electric to assist net zero-carbon targets
Airport design Validation for London Stansted Airport
  • Validating design for future development
  • Operational Readiness Activation and Transition (ORAT)
  • Check-in to gate E2E capacity assessment with dynamic simulation
Bristol Airport Capacity Assessment with NATS
  • End to End Airport Capacity Assessment in collaboration with NATS covering Kerbside to Airspace.
  • Whole airport terminal capacity assessment, utlising the existing terminal footprint.
  • Provided input in multiple areas with finding solutions to improve capacity and efficiency.
Image Sourced: By Sweett Group
  • Simulations and project management to move all airlines to the new Integrated Baggage System
  • Managing the tender process for a new baggage system through to a successful conclusion.
Heathrow Airport Trolley Analysis
  • Analysis of baggage trolley movements to understand demand and space if capacity was increased